Tampa Electric
Interconnection-Net Metering
As an extension of our Renewable Energy program,
Tampa Electric will provide interconnection with net metering to a
renewable energy system installed at your home or business. Renewable
generating sources can include a solar panel system (also referred to
as a photovoltaic or PV system), a wind-powered system, biomass, or
other renewable sources as defined by Florida Statutes and .
After you complete a certified installation, Tampa Electric will
install, own and maintain metering equipment used to measure excess
kilowatt-hours of electricity produced by your system. With net
metering, excess electricity will be delivered to Tampa Electric’s
grid, and in return, you will receive a full credit on your electric
bill for that electricity.
Learn more from the Florida Public Service Commission’s .
Getting started is easy – just follow these steps:
- Complete and submit an application.
- Complete an interconnection agreement based on the rating of your renewable generating system, and provide the following:
- Tier 1 interconnection agreement for systems 10kW or less:
- No application fee.
- Proof of insurance recommended.
- Provide a copy of the manufacturer’s installation, operation and maintenance instructions.
- A
manual disconnect switch of visible load break type must be installed
adjacent to meter, prior to inspection (Tampa Electric will reimburse
customer for installation on systems 10 kW or less).
- Proof of inspection and approval by local code authority.
- Tier 2 interconnection agreement for systems greater than 10kW to 100kW:
- Application fee: $250.
- Proof of insurance not less than $1,000,000 general liability (see condition #9).
- Provide a copy of the manufacturer’s installation, operation and maintenance instructions.
- A manual disconnect switch of visible load break type must be installed adjacent to meter prior to inspection.
- Proof of inspection and approval by local code authority.
- Tier 3 interconnection agreement for systems greater than 100kW to 2MW:
- Application fee: $500.
- Proof of insurance not less than $2,000,000 general liability (see condition #9).
- Provide a copy of the manufacturer’s installation, operation and maintenance instructions.
- A manual disconnect switch of visible load break type must be installed adjacent to meter, prior to inspection.
- Proof of inspection and approval by local code authority.
- May require interconnection study (see condition #11).
- Mail your completed application, interconnection agreement and other required documentation to:
Attn: Renewable Energy Program, Plaza 5
Tampa Electric
P.O. Box 111
Tampa, FL 33601-0111
Upon
receipt of required documentation, an inspection of your equipment will
be scheduled by a Tampa Electric representative to ensure proper
interconnection. After written notification is received from Tampa
Electric, your traditional meter will be replaced with a bi-directional
meter and you can begin to operate your system.
To speak with a Tampa Electric representative regarding interconnection and net metering, call 813-228-4848.
More about installing your own solar panel system
Several
resources are available to learn more about the costs to install and
maintain a solar panel system. Currently, there are federal and state
incentives that can help offset costs.
(general information)
(federal incentives)
(state incentives)
Source = Tampa Electric